Newsroom

News | 30.6.2026

Merus Power signs 20 MW / 41 MWh battery energy storage deal with Exilion

Merus Power has secured an order with Exilion to deliver a 20 MW / 41 MWh battery energy storage solution at the Varevaara wind farm...

Read more
News | 30.6.2026

Merus Power is supplying Siemens Mobility Denmark with a power quality solution for a battery-powered train charging station

Merus Power is supplying Merus® STATCOM compensator to Siemens Mobility Denmark. Siemens Mobility is one of the world’s leading suppliers of rail rolling stock, infrastructure,...

Read more
News | 16.6.2026

Agreement with wpd Söderskogen Vindpark Oy for a 30 MW / 60 MWh battery energy storage

Merus Power has signed an agreement with wpd Söderskogen Vindpark Oy for a 30 MW / 60 MWh battery energy storage project in Finland. The...

Read more
Blog

Grid-forming ability: from battery energy storage to grid asset

The power system is changing faster than ever. Across Europe and globally, conventional synchronous power generation is being replaced by renewable generation, HVDC connections, and...

Read more
Blog

Practical comparison: Active Front End drives vs. centralized active harmonic filtering

In this blog, I will discuss methods for mitigating harmonic distortion caused by Variable Frequency Drives (VFDs), also known as Variable Speed Drives (VSDs) or...

Read more
News | 3.6.2026

Merus Power and CATL to collaborate on battery energy storage in Northern Europe

Merus Power Plc and Contemporary Amperex Technology Co., Limited (CATL) have signed a strategic cooperation agreement regarding the delivery of approximately 3GWh of BESS solutions...

Read more
News | 1.6.2026

Merus Power strengthens its position among the winners of the energy transition

Electrification and the energy transition are increasing demand for solutions that make power systems more stable, flexible, and energy-efficient. We at Merus Power are pursuing...

Read more
Blog

The most critical steps in BESS site commissioning

In every Battery Energy Storage System (BESS) project, there is a defining moment when everything comes together: commissioning. Commissioning is not just another project milestone....

Read more
Blog

Are all STATCOMs the same?

STATCOM stands for Static Synchronous Compensator and is part of the Flexible AC Transmission System (FACTS) family. In modern power grids, STATCOMs are widely used...

Read more
Blog

IEEE 519 maximum demand current: Interpretation, pitfalls, and practical approach

In its standard interpretation, IEEE 519 (2022) allows a situation in which harmonic compliance can be achieved simply by increasing the load, without reducing harmonic...

Read more
News | 22.4.2026

Merus Power joins Finnish business delegation on state visit to Egypt

Merus Power is participating in the Finnish President’s state visit to Egypt as part of a delegation of Finnish companies. The aim of the visit...

Read more
News | 2.4.2026

Balancing work and life at Merus Power

People at Merus Power build the future of energy, while much is happening in their lives outside of work. We sat down with our HR Director,...

Read more
Back to top

Contact us!